A Photo Record of the Building
Renovation
Part III Photos
are arranged by date, with the most recent additions at the top. This is the final installment. |
|
| mid-January, 2012 Except for some touch-up items, the project is done! The new gathering space was used for the first time on Christmas Eve. Here are some photos of the completed project. | |
![]() | ![]() |
| The new parking lot entrance. It is our defacto main entrance. | The elevator in the parking lot entrance. It goes to all levels of the educational wing. |
![]() | ![]() |
| The new Franklin Ave. entrance on a snowy January day. | Information kiosk in the Gathering Space |
![]() | ![]() |
| The Gathering Space. The double doors on the right lead to the new Franklin Ave. entrance. | The Gathering Space and looking into the Conference Room. Much of the furniture was reused from the Linden Parlor. |
![]() | ![]() |
| The Conference Room. The paneling, table, and chairs were reused from the Linden Parlor. | The Gathering Space with the coffee serving area. |
![]() | ![]() |
| The new entrance to the Sanctuary from the Gathering Space. | The Gathering Space in action; this was the reception for Jason Mack. |
| Dec. 14, 2011 | |
![]() | ![]() |
| The new stairway from the upper level to the main level. | The Steering Committee inspected the work. |
![]() | ![]() |
| The lift from the fellowship hall level to the lower level. | The entrance to the Sanctuary from the Gathering Space. |
![]() | ![]() |
| The temporary wall has been removed, expanding the church office. | The parking lot entrance is nearing completion. |
| Nov. 12, 2011 | |
![]() | ![]() |
| The new entrance on Franklin Ave. is starting to take shape. | Another view of the new Franklin Ave. entrance. |
![]() | ![]() |
| Note the resemblance of the arches to the arches in the sanctuary. | Putting the first arch in place for the new parking lot entrance. |
![]() | |
| Both arches are now in place. | |
| Sept. 21, 2011 | |
![]() | ![]() |
| The start of the new Franklin Ave. entrance. Note the opening in the wall. | The opening for the Franklin Ave. entrance seen from inside. |
![]() | ![]() |
| The famous tunnel under the church, with its top removed. | Now, who is going to use this for an exit? Really? |
![]() | ![]() |
| Cutting out the old concrete under the old stairway. | The steel beams for the new floor filling in the old stairway. |
![]() | ![]() |
| Erecting the steel for the new parking lot entrance. | Above all the construction chaos, the cross is still a beacon to the neighborhood. |
| Sept. 11, 2011 | |
![]() | ![]() |
| Laying the brick exterior on the new addition. | Mystery Quiz: What are we looking at? |
![]() | ![]() |
| Church school gets off to good start amidst all the construction. | The Gathering Space is starting to take shape: Note the serving area (behind the equipment) and the framing for wall creating the conference room. |
| Aug. 31, 2011 | |
![]() | ![]() |
| The foundation for the new Franklin Ave. entrance | |
| Aug. 24, 2011 | |
![]() | ![]() |
| How high will the new addition go? | A member of your steering committee at work. |
| Aug. 14, 2011 | |
![]() | ![]() |
| The new parking lot entrance is starting to emerge. | The start of the framing of interior walls. |
| Aug. 4, 2011 | |
![]() | ![]() |
| Preparing for the new Franklin Ave. entrance. | |
![]() | ![]() |
| View from the inside. | Continued work on the foundation for the new parking lot entrance. |
| July 28, 2011 | |
![]() | ![]() |
| The future gathering space. | Making room for the new restrooms. |
![]() | ![]() |
| The stairs are gone. | A different view of the three levels of the educational wing. |
![]() | ![]() |
| Foundation for the new stairway and elevator. | |
![]() | ![]() |
| A temporarily shrunken church office. | Excavating for the new Franklin Ave. entrance. |
| July 24, 2011 - Photos by Bill Hausler | |
![]() | ![]() |
![]() | ![]() |
| July 10, 2011 - The ground breaking ceremony. Photos by Bill Hausler | |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | ![]() |
![]() | |
| July 5, 2011 | |
![]() | ![]() |
| The tree has to come down. | |
![]() | ![]() |
![]() | ![]() |
| Many volunteers put in a lot of hours getting the church ready for the construction. | Construction equipment in the parking lot. |
![]() | ![]() |
| Sealing off the organ from the construction dust. | Walling off the sanctuary from the construction area. |
| July 3, 2011 | |
![]() |
![]() |
| Building Permit |
Getting the library ready for the renovation. |
![]() |
|
| Hallway outside office being used for temporary storage. | |